We use cookies to help improve your browsing experience.


The apartment complex consists of a 2012-2014 renovated house and a 2013-2014 newly build 3 story addition. The house was stripped to its core for the renovation; Even the foundation was remade during the process. The electric wiring, water conduits and heating where completely renewed. High quality Italian tiling was used above the underfloor heating. All windows where replaced with three-pane windows. 2014 the truss was reinforced, 20 cm insulating installed and tiled with natural slate. Traditionally was the outdoor facility redesigned with natural granite. The house was fully thermally insulated and the exterior as rendered in 2015. Each of the 4, 1 bedroom and 1 living room apartments is equipped with a high quality bathroom and a build-in kitchen.